Sari direct la continut
Peste 10 milioane de produse, intr-un singur loc.
Produs

Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants, Paperback/Roger W. Light

Vânzător
elefant.ro elefant.ro
Pret
349.99 Lei
Categorie (vânzător)
Foreign Books
Marca
American Society of Mechanical Engineers

Produs actualizat în urmă cu 1 lună
Descriere YEO:

Consensus on Pre-Commissioning Stages for - Disponibil la elefant.ro

Pe YEO găsești Consensus on Pre-Commissioning Stages for de la American Society of Mechanical Engineers, în categoria Foreign Books.

Indiferent de nevoile tale, Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants, Paperback/Roger W. Light din categoria Foreign Books îți poate aduce un echilibru perfect între calitate și preț, cu avantaje practice și moderne.

Preț: 349.99 Lei

Caracteristicile produsului Consensus on Pre-Commissioning Stages for

  • Brand: American Society of Mechanical Engineers
  • Categoria: Foreign Books
  • Magazin: elefant.ro
  • Ultima actualizare: 13-07-2026 00:25:33

Comandă Consensus on Pre-Commissioning Stages for Online, Simplu și Rapid

Prin intermediul platformei YEO, poți comanda Consensus on Pre-Commissioning Stages for de la elefant.ro rapid și în siguranță. Bucură-te de o experiență de cumpărături online optimizată și descoperă cele mai bune oferte actualizate constant.


Descriere magazin:
This publication is an important adjunct to several previously published documents prepared to inform, educate and assist the reader in adequately considering and planning for the many major activities involved in the design, construction and start-up of cogeneration and combined cycle power plants. Experience has shown that failure to consider the complex interrelationships between the various component systems can result in costly delays in project completion and turn over dates. Additionally, incorrect procedures and planning can result in damage or failure of key pieces of equipment or systems during subsequent operation. This consensus was prepared by a task group of this subcommittee under the leadership of Edward Beardwood. The task group consisted of representatives of manufacturers, operators and consultants involved with the planning, design, manufacture, operation and monitoring of industrial and utility boilers, steam generators and associated equipment and systems. The ASME Research and Technology Committee on Water and Steam in Thermal Systems will review, revise and reissue this document from time to time as necessary to comply with advances in technology in the design of these plants and the water treatment options.

Consensus on Pre-Commissioning Stages for Cogeneration and Combined Cycle Power Plants, Paperback/Roger W. Light - 0 | YEO

Produse asemănătoare

Produse marca American Society of Mechanical Engineers